ICP *9MPT050F12 Installation Instruction page 5

Fan assisted,direct or non--direct vent gas furnace
Table of Contents

Advertisement

Figure 1
Typical Upflow Installation
Aluminum or non--rusting shield recommended.
(See Vent Termination Shielding for dimensions).
*8² Min.
20¢ Max.
in same
atmospheric
zone
Vent Pipes MUST be
supported
Horizontally and
Vertically
*
Increase minimum from 8² ² ² ² to 18² ² ² ² for cold climates (sustained temperatures
below 0 ° ° ° ° F).
Figure 2
Typical Downflow Installation
See Vent Termination
Shielding in Vent Section.
*8² Min.
Inlet Pipe
20¢ Max. in same
(not used on
atmosphericzone
Single Pipe
model)
Vent Pipes MUST
be supported Horizon-
tally and Vertically
*
Increase minimum from 8² ² ² ² to 18² ² ² ² for cold climates (sustained temperatures
below 0° ° ° ° F).
Installation Requirements
1. Install furnace level.
2. This furnace is NOT to be used for temporary heat of build-
ings or structures under construction.
3. Install furnace as centralized as practical with respect to the
heat distribution system.
440 01 2021 01
Coupling on ends of
Inlet Pipe
exhaust pipe. Total
(not used on
pipe & coupling out-
Single Pipe
side structure = 8²
model)
*8² Min.
20¢ Max.
in same atmospheric zone
25--23--33
Coupling on inside
and outside of wall to
restrain vent pipe
*8² Min.
20¢ Max.
in same
atmospheric zone
25--23--33a
4. Install the vent pipes as short as practical, and in accor-
dance to these instructions. (See Vent and Combustion
Air Piping section).
5. Maintain clearance for fire safety and servicing. A front
clearance of 24² is required for access to the burner, con-
trols and filter. See clearance requirements in Figure 4.
6. Use a raised base for upflow furnace if the floor is damp or
wet at times.
7. For downflow installations, non combustible subbase must
be used under the furnace unless installation is on a non
combustible floor surface. This requirement applies even
when a coil box or cabinet is used.
8. For horizontal installations, line contact is permissible only
between lines formed by intersection of back and two sides
of furnace jacket, and building joists, studs or framing.
9. Residential garage installations require:
·
Burners and ignition sources installed at least 18² above
the floor.
·
Located or physically protected from possible damage by
a vehicle.
10. Local codes may require a drain pan under the entire fur-
nace and condensate trap when the furnace is installed in
attic application.
This furnace may be used for construction heat provided that all
the following conditions are met:
·
The furnace is permanently installed with all electrical wir-
ing, piping, venting and ducting installed according to these
installation instructions. A return air duct is provided, sealed
to the furnace casing, and terminated outside the space
containing the furnace. This prevents a negative pressure
condition as created by the circulating air blower, causing a
flame rollout and/or drawing combustion products into the
structure.
8² Min.
·
The furnace is controlled by a thermostat. It may not be "hot
wired" to provide heat continuously to the structure without
thermostatic control.
·
Clean outside air is provided for combustion. This is to mini-
mize the corrosive effects of adhesives, sealers and other
construction materials. It also prevents the entrainment of
drywall dust into combustion air, which can cause fouling
and plugging of furnace components.
·
The temperature of the return air to the furnace is main-
tained between 55° F (13° C) and 80° F (27° C) , with no eve-
ning setback or shutdown. The use of the furnace while the
structure is under construction is deemed to be intermittent
operation per our installation instructions.
·
The air temperature rise is within the rated rise range on the
furnace rating plate, and the firing rate has been set to the
rating plate value.
·
The filters used to clean the circulating air during the
construction process must be either changed or thoroughly
cleaned prior to occupancy.
·
The furnace, ductwork and filters are cleaned as necessary
to remove drywall dust and construction debris from all
HVAC system components after construction is completed.
·
After construction is complete, verify furnace operating con-
ditions including ignition, input rate, temperature rise and
venting according to these instructions.
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the *9MPT050F12 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents