Download Print this page
ICP N9MP2 Installation Insrtuctions
ICP N9MP2 Installation Insrtuctions

ICP N9MP2 Installation Insrtuctions

Vent drain kit multi position gas furnaces
Hide thumbs Also See for N9MP2:

Advertisement

INSTALLATION
INSTRUCTIONS
For Vent Drain Kit NAHAOOIDK
used on N9MP1, N9MP2,
*9MPD,
*9MPT & *9MPV Multi
Position
Gas Furnaces.
Denotes
Brand (T, H or C)
Please
read
these
instructions
completely
before
attempting
installation.
Parts List for Plastic
Bag
Description
Coupling,
Discharge
Clamp,
Hose
Gasket,
Trap
SMS, #8 X 1/2" Conical
Clamp,
5/8" ID
Clamp,
3/4" ID
Parts List for Carton
Yellow
or Black
Cap (for #1014003)
1170893
USE THE PARTS IN THIS KIT. EQUIVALENT
PARTS IN THE
FURNACE MAY BE DISCARDED.
Part#
Qty.
1002522
1
Description
Part#
Qty.
1013830
2
Plastic,
Bag
1013402
1
1013701
1
Tube,
Rubber
3/16" ID
1009238
1
1012537
2
Drain Tee
1171915
1
1012975
2
Drain Tee Trap
1171916
1
1012976
2
Trap,
Condensate
1171917
1
2
Timprene
Drain
Hose
1/2" ID
1014358
1
Timprene
Drain
Hose
518" ID
1014359
1
Instructions,
Drain
Kit
441 06 1043 O0
1
Drain,
Vent
1014003
1
These
instructions
are a supplement
to the Installation
Instructions
shipped
with
each furnace.
Refer
to these
instructions
for details
on vent
pipe
sizing,
maximum
vent
lengths,
assembling
the vent
system
and starting
up the furnace.
Upflow
Top Vent (*9MPD, *9MPT & *9MPV)
Yellow or black Plastic
TOP Venting
aps (Z)
Dual Pressure
_
Switch
Detail
_
_
VentDrain
_
// _
I
(optional)
E
F _:_q
Drain
/
Tee\
L_
_
Hose&
Clamps_
& Clamps
_1
Siwnigt I& PrDeetaS_l
re
Representive
drawing,
some views will vary,
Trap Connection
"Clamp ears"
Pointed OUT
Preassemble &
insert into furnace
3/16" I,D.
Rubber
tube
25-24-41
UpflowTop
Vent (See Figure 1)
Replace
and discard
the Vent Drain shipped
with the furnace
if it
is the black
Fasco
coupling.
Replace
with the gray Vent Drain
shipped
with the kit.
Attach the 1/2" ID drain hose from the bottom
of the drain tee to the
condensate
trap and securely
clamp.
Attach the 3/16" ID rubber
tube from the top of the transition
box
to
the drain trap.
Attach a Yellow or black cap to bottom
port of vent drain and secure
with clamp.
Attach the 5/8" ID hose from the bottom
of the transition
box to the
drain
trap and securely
clamp.
441 06 1043 O0 (2/2003)

Advertisement

loading
Need help?

Need help?

Do you have a question about the N9MP2 and is the answer not in the manual?

Questions and answers

Summary of Contents for ICP N9MP2

  • Page 1 INSTALLATION INSTRUCTIONS For Vent Drain Kit NAHAOOIDK used on N9MP1, N9MP2, *9MPD, *9MPT & *9MPV Multi Position Gas Furnaces. Denotes Brand (T, H or C) Please read these instructions completely before attempting installation. Parts List for Carton Parts List for Plastic...
  • Page 2 Upflow Left Side Vent & Trap Vent Drain & Clamps YelloworblackPlastic Coupling & Clamps (optional) _'_'_ Dual Pressure Switch Detail 3/16" I.D. Rubber tube 1/2" LD, Drain Hose & Clamps Single Pressure Switch Detail Trap Connection "Clamp ears" Pointed OUT Preassemble &...
  • Page 3 Upflow Right Side Vent & Trap Dual Pressure Switch Detail 3/16" I,D. Rubber tube Coupling (optional) See Note 1 Single Pressure Switch Detail 518" I,D. Hose Tee Trap & Clamps 112"I.D, Drain Hose & Clamps 25-24-41b Upflow Right Side Vent (See Figure 3) Replace and discard the Vent Drain shipped...
  • Page 4 Downflow Left Side Vent & Trap Dual Pressure Switch Detail Coupling & Clamps (optional) 3/16" I.D, Rubber tube llz" I.D. Drain 518" I.D. Hose Hose & Clamps & Clamps 25-24-45 Downflow Left Side Vent (See Figure 4) Replace and discard the Vent Drain shipped with the furnace if it...
  • Page 5 Downflow Right Side Vent & Trap 3/16" I.D. Rubber tube Trap Connection "Clamp ears" Pointed OUT 5/8" I,D. Hose 112" I.D. Drain & Cla_ie & Clamps Preassemble& insertimofurnace 25-24-46 Downflow Right Side Vent (See Figure 5) Replace and discard the Vent Drain shipped with the furnace if it IMPORTANT...
  • Page 6 Horizontal Left-Thru Coupling & Clamps (optional) Single Pressure Switch Detail 3/16" I.D, Rubber tube Note 1 518" I.D. Hose Trap Connection llz" I,D. Drain Yellow or Hose & Clamps Alternate Orientation black Cap "Clamp ears" & Clamp Pointed OUT 25-24-47 Preassemble &...
  • Page 7 Horizontal Left Side Vent See Note 1 le Pressure Switch Detail Tee T rap Hose & Clamps Trap Connection Alternate Orientation 5/8" I.D. Hose 3/16" I.D, Rubber tube & Clamps "Clamp ears" Pointed OUT Preassemble& 25-24-48 insertinto furnace Horizontal Left Side Vent (See Figure 7) Replace and discard the Vent Drain shipped...
  • Page 8 Horizontal Right-Thru Alternate Orientation Single Pressure Switch Detail Yellow Coupling 1/2" I,D. Drain black & Clamps Hose & Clamps & [optional) See Note Tee Trap 3/16" I,D. Rubber tube I.D, Hose Connection Trap & Clamps "Clampears" Pointed OUT Preassemble & insert into furnace 25-24-49 Horizontal Right- Thru Top (See Figure 8)
  • Page 9 Horizontal Right-Side Vent Couplings. & Clamps _. _HnHnlfl_E _HnHnlfl_C Single Pressure Note Switch Detail 11z" I,D. Drain Hose & Clamps Tee Trap 3/16" I.D. Rubber tube _" Trap Connection 518" I.D, Hose & Clamps "Clamp ears" Pointed OUT Preassemble & insert into furnace 25-24-50 Horizontal Right- Side Vent (See Figure 9)
  • Page 10 Connecting Tee Trap to Condensate Trap and Main Drain Line Open Tee Evaporator Coil Drain Line Main Drain Line 25-24-41T The Tee Trap must be connected to the main condensate drain The drain line from the Tee Trap is to be connected to the fur- line as conceptually shown...

This manual is also suitable for:

9mpt9mpd9mpvN9mp1Naha001dk