GE AJEM 10 Owner's Manual And Installation Instructions page 16

Table of Contents

Advertisement

Available languages

Available languages

Read these instructions completely and carefully.
PREPARE OPENING IN WALL
1
Make certain a wall receptacle is available close
to the hole location or make arrangements to install
a receptacle.
The cord length for the 115-volt models is 72
to the right and 47 to the left.
For the 230/208-volt models the cord length is 65
to the right and 39 to the left.
MINIMUM
OPENING
15
26
15
26
3 4
1 8
5 8
SUPPORT REQUIREMENTS FOR AIR
2
The air conditioner wall case may be installed
with 1/4 min. extension out from the inside wall
or with 1/4 min. extension out from the outside wall.
The finished sides of the opening should be structural
wall members.
Use a lintel in brick veneer and brick
and block types of wall to support the bricks
or blocks above the opening. Do not allow the wall
case to be used in lieu of a lintel.
Install flashing (drip rail) as shown
to prevent water from dripping inside the wall
and down the outside of the building.
Brick veneer
Lintel angle
(if required)
Caulking
(on all 4 sides
on the outside
and inside
of the case)
Flashing
(drip rail)
1/4 min. extension
inside the wall from
the trim molding
16
Installation Instructions
* Dimensions may need
to be increased to fit
unique situations in the
16
1 16
field if using case angles.
Plaster line
Trim
molding
(if desired)
Caulking
(above
Room side
and
below the
flashing)
SUPPORT REQUIREMENTS FOR AIR
3
Mortar between the case and the brick wall around
the case may be undercut at about 45° for
improved caulking.
Inside
Top of case
Outside
Caulking
Undercut
mortar

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents