Peak PAC Auto PAC 300 Operation Manual page 30

Strapping machine
Table of Contents

Advertisement

b. TP-601L
Fig A:
If you have moved the LS4 Micro Switch to the left up to the bottom but you still do
not have enough P.P. strap in the accumulator box, you can loosen nut E and turn the
bolt D C.C.W. increase the amount of P.P. strap in the accumulator box. Finally
tighten the nut E.
T7-3-10190
Micro Switch (LS4)
M6 Screw
T7-3-10200
- 24 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents