2 FLOW CHART OF INSTALLATION

Design kicking-off
Material selection
Inspection of site installation position
Installation of indoor unit
Installation of outdoor unit
Installation of BU module
Installation of
Connection of
Connection of
Connection of
Connection of
Connection of
remote
transmission
transmission
power cables
power cables
power cables
controller
line
line
Installation of
piping adapter
Assign the
address
Installation of refrigerant pipes
Leakage test
Vacuum the system through
the gas and liquid valves
Refrigerant charging
Open the valves
Installation of drainage pipes
Thermal insulation of connection pipes and drainage pipes
Test run
Commissioning of complete unit
As-bulit drawing
Delivery of the operating instructions