Download Print this page

OEM TUF-2000F User Manual page 11

Integrated ultrasonic flow meter

Advertisement

TUF-2000F User Manual
20. Timed alarm #2
22. Periodically M51 Timer 23. Oct Not Using
The OCT circuit does not source voltage at its output. It must be connected with an
external power and pull-up resistant for some occasions.
When the OCT circuit is close, it will draw current. The maximum current shall not
be over 100mA.
Attention: the maximum voltage applied to OCT can not be over 80 volts.
Relay or OCT2 setup
By selecting a proper input source, the RELAY will close when the trigger event
occurs
The available trigger sources are:
0. No Signal
2. Not Ready(No*R) 3. Reverse Flow
5. FO Over 120%
8. Batch Control
11.NET Int Pulse
M79
14.Energy NET Pulse 15.MediaVel=>Thresh 16.MediaVelo<Thresh
17.ON/OFF viaRS232 18. Timer (M51 Daily) 19.Timed alarm #1
20. Timed alarm #2
22. Periodically M51 Timer 23. Disable Relay
The RELAY is of SPST (Single pole, single throw) type. It is rated for 110VAC max
and have a current rating of 0.5A resistive load.
It highly recommended that a salve relay to be utilized whenever a large resistive
load or inductive load is to be controlled.
Note. In order to make the user interface compatible with the former version7, the
name RELAY was used other than OCT2, but in fact it is an OCT output.
Window for selecting the trig signal for the built-in batch controller. Available trig
sources:
0. Key input
1. Serial port
2. AI3 rising edge
3. AI3 falling edge
4. AI4 rising edge
5. AI4 falling edge
6. AI5 rising edge
M80
7. AI5 falling edge
8.Timer periodically
9.Timer daily
For the input analog current signal, 0 mA indicates "0", 4mA or more indicates '1'.
By selecting item #8, the batch totalizer can be started periodically by the internal
timer located at Menu51. When the batch totalizer is full, a signal which indicate the
batch is full can be direct to either the OCT or the RELAY terminals to stop the
pump or other devices.
By selecting item #9, the batch totalizer could act as totalizer witch runs for only a
period of the day so that a alarm signal could be produced if the total flow during
that time period is over a certain amount of. For example, if you want a alarm signal
21.Batch Totalizer Full
1. Poor Signal
6. Alarm #1
9. POS Int Pulse
12.Energy POS Pulse 13.Energy NEG Pulse
21.Batch Totalizer Full
(press ENT key to start the batch controller)
(when AI3 receives 2mA or more current)
(when AI3 stop receiving 2mA or more current)
(when AI3 receives 2mA or more current)
(when AI3 stop receiving 2mA or more current)
(when AI3 receives 2mA or more current)
(when AI3 stop receiving 2mA or more current)
(define the start time and interval time in M51)
(define the start time and interval time in M51)
11
4. AO Over 100%
7. Reverse Alarm #2
10.NEG Int Pulse

Advertisement

loading