Vaillant ECOmax VUW 236 EH Instructions For Installation And Servicing page 54

Table of Contents

Advertisement

7.22.1 Replacement of boiler
display board (fig. 94)
Slide the connecting plug (1) for-
wards to release from connecting
pins.
Move retaining clips (2) outwards
and slide board upwards to
remove.
Reassemble in reverse order.
Carry out electrical checks
(see Section 5.1)
7.22.2 Replacement of rectifier
board
Remove screw (3, fig. 94) and lift
cover panel (4, fig. 94) off control
box.
Unplug two leads (1, fig. 95) from
the mother board.
Remove two screws (2, fig. 95) and
remove rectifier board.
Reassemble in reverse order.
Carry out electrical checks
(see Section 5.1)
7.22.3 Replacement of mother
board (fig. 96)
Remove rectifier board as in
Section 7.22.2.
Disconnect all plug connectors (1)
from board.
Disconnect white wire (2) from
earth terminal strip
Disconnect pump supply plug (3)
and lift clear of board.
Push two spring retainers (4) to the
right and lift right hand side of
circuit board off retainers.
Lift and pull circuit board to the
right to release from retainer lugs
(5).
Reassemble in reverse order.
Carry out electrical checks
(see Section 5.1)
54
fig. 93
fig. 94
fig. 95
fig. 96

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecomax vuw 286 eh

Table of Contents