Servicing - Vaillant ECOmax VUW 236 EH Instructions For Installation And Servicing

Table of Contents

Advertisement

6. Servicing

To ensure the continued safe and effi-
cient operation of the boiler it is
recommended that it is checked and
serviced as necessary at regular
intervals. The frequency of servicing
will depend upon the particular instal-
lation conditions and usage, but in
general once per year should be ade-
quate. It is law that all servicing work
is carried out by a competent person
(Corgi registered).
IMPORTANT:
Before starting any maintenance
work:
Isolate the mains electricity supply
by disconnecting the plug at the
socket outlet (if there is an isolating
switch only remove the fuse from
the switch).
Turn OFF the gas supply at the gas
service valve fitted to the boiler.
Always test for gas soundness and
always carry out functional checks
after any service work and after
exchanging any gas carrying
component.
Always check earth continuity,
polarity and resistance to earth with
a multimeter after any service work
and after exchanging any elec-
trical component.
Note: The boiler is fitted with a
combustion analysis test point. A
suitable combustion analyser can be
connected to this point to establish
the combustion performance of the
boiler.
34
fig. 46

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecomax vuw 286 eh

Table of Contents