Test Run - LG ARUB230BT2 Installation Manual

Multi v sync ii system heat recovery outdoor unit
Hide thumbs Also See for ARUB230BT2:
Table of Contents

Advertisement

Available languages

Available languages

Test Run

Checks Before Test Run
1
Check to see whether there is any refrigerant leakage, and slack of power or transmission cable.
2
Confirm that 500 V megger shows 2.0 MΩ or more between power supply terminal block and ground.
Do not operate in the case of 2.0 MΩ or less.
NOTE: Never carry out megaohm check over terminal control board. Otherwise the control board
would be broken.
Immediately after mounting the unit or after leaving it turned off for an extended length of time,
the resistance of the insulation between the power supply terminal board and the ground may
decrease to approx. 2 MΩ as a result of refrigerant accumulating in the internal compressor.
If the insulation resistance is less than 2 MΩ, turning on the main power supply and energizing
the crankcase heater for more than 6 hours will cause the refrigerant to evaporate, increasing
the insulation resistance.
3
Check if Liquid pipe, High Pressure Gas, Low Pressure Gas are fully opened
NOTE: Be sure to tighten caps.
4
Check if there are any problems in automatic addressing or not:
Check and confirm that there are no error messages in the display of indoor units or remote controls
and LED in outdoor units.
CAUTION
when cutting main power of the Multi V
• Always apply main power of the outdoor unit during use of product
• Always apply power before 6 hours to heat the crank case heater where performing test run after
installation of product. It may result in burning out of the compressor if not preheating the crank
case with the electrical heater for more than 6 hours.(In case of the outdoor temperature below
10°C(50˚F))
Test Run
Installation Manual 67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents