Control Box And Connecting Position Of Wiring - LG ARUB230BT2 Installation Manual

Multi v sync ii system heat recovery outdoor unit
Hide thumbs Also See for ARUB230BT2:
Table of Contents

Advertisement

Available languages

Available languages

Control box and connecting position of wiring

- Remove all of the screws on front panel, and remove the front panel by pulling it forward.
Front Panel
WARNING
The temperature sensor for outdoor air should not be exposed to direct sunlight.
- Provide an appropriate cover to intercept direct sunlight.
Inverter
PCB
Inverter
FAN PCB
- Connect communication line between master and
slave outdoor unit through the terminal block.
- Connect communication lines between outdoor unit
and indoor units through the terminal block.
- When the central control system is connected to the
outdoor unit, a dedicated PCB must be connected
between them.
- When connecting communication line between out-
door unit and indoor units with shielded wire, con-
nect the shield ground to the earth screw.
UW1 Chassis(208/230V)
Take care of the phase sequence
of 3-phase 3-wire power system
Electrical Wiring
Noise
Filter
Main
PCB
Magnet
switch
Installation Manual 43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents