Installing Batteries, Test Run, Performance Evaluation - LG LS243HLV Installation Manual

Hide thumbs Also See for LS243HLV:
Table of Contents

Advertisement

Installing Batteries into the Handheld Remote
Controller
For information on using the handheld remote controller, refer to its owner's manual.
1. The remote controller needs two AAA (1.5V) batteries for operation. Remove the battery
cover from the back of the remote controller by pushing downward on the tab at the top
of the battery cover, and then lift up to remove.
2. Insert the two new batteries.
• Align batteries by the (+) and (-) sides.
• The interior battery compartment of the remote controller will have clear markings for
the (+) and (-) placement.
3. Verify that the batteries have clicked into the compartment and are firmly engaged with
the contacts on either side of them.
4. Reattach the back cover of the remote controller.
5. Proceed with powering on the remote controller and use as needed. Remove the bat-
teries if system won't be used for an extended time.
Test Run
After all installation and testing procedures are complete, the system is ready for a test run. Follow the guidelines below.
1. Check that all drain piping, refrigerant piping, and wiring / cables are properly connected.
2. Check that both the gas (vapor) suction and liquid refrigerant piping service valves are fully open.
3. Install the batteries into the handheld remote controller (see above).
4. Turn on the power to the outdoor unit, and test system operation.
5. As system operating, make notes as needed to troubleshoot any issues that might appear.
Performance Evaluation
Operate the unit in heating and / or cooling, depending on outdoor conditions, for 15 to 20
minutes, then check the system refrigerant charge (feature availability depends on model):
1. Measure the pressure of the gas (vapor) suction service valve. See optimum psig in table
at right.
2. Measure the air temperature from both the inlets and outlets.
3. Verify the difference between the inlet and outlet temperatures is > 14.4°F.
4. The air conditioner is now ready to use.
• If all modes can't be tested all at one time, testing must be performed later when weather
conditions permit.
• If the actual pressure is higher than shown, the system is most likely overcharged, and
charge must be removed. If the actual pressure is lower than shown, the system is most
likely undercharged, and charge must be added.
FINAL INSTALLATION PROCEDURES

Installing Batteries, Test Run, Performance Evaluation

Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 86: Installing the Remote Controller
Batteries.
Battery Cover
Tab
Battery
Cover
1. Push down on tab
2. Lift cover
3. Insert
batteries
Figure 87: Performance Evaluation Measure-
ment Locations.
Inlet Temperature
Discharge
Air
Table 19: Gas Side Pressure at Optimum Condi-
tion When System is in Cooling.
Outside Ambient
Gas (Vapor) Service
Temperature
Valve Pressure
95°F
120~135 psig
3
Discharge
Temperature
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls303hlvLs363hlv

Table of Contents