LG ARUB230BT2 Installation Manual page 190

Multi v sync ii system heat recovery outdoor unit
Hide thumbs Also See for ARUB230BT2:
Table of Contents

Advertisement

Available languages

Available languages

Instalación de los conductos de refrigeración
Conexión de las unidades exteriores
2 unidades exteriores
Modelo
Conducto de gas de baja presión
Ø34.9(1-3/8)
Ø31.8(1-1/4)
Ø28.58(1-1/8)
ARCNB20
OD34.9(1-3/8)
OD28.58(1-1/8)
Ø38.1(1-1/2)
26
26
unidad exterior
unidad exterior
Ø28.58(1-1/8)
Ø12.7(1/2)
Ø19.05(3/4)
Ø28.58(1-1/8)
Ø22.2(7/8)
Ø19.05(3/4)
Ø15.88(5/8)
Ø22.2(7/8)
OD19.05(3/4)
Conducto de líquido
Ø 9.52(3/8)
Ø12.7(1/2)
Ø19.05(3/4)
Ø12.7(1/2)
Ø15.88(5/8)
Ø22.2(7/8)
OD12.7(1/2)
Ø9.52(3/8)
OD19.05(3/4)
[Unit:mm(inch)]
Conducto de gas de alta presión
Ø22.2(7/8)
Ø19.05(3/4)
Ø28.58(1-1/8)
Ø22.2(7/8)
Ø22.2(7/8)
Ø15.88(5/8)
OD22.2(7/8)
Ø19.05(3/4)
Ø15.88(5/8)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents