Installation
1
Optional items
2
Bubble trap
3
3-way ball valve (Auto Flush Kit)
4
Cooling water to drain
5
Cooling water out
6
Flow control valve
7
Sample in
8
Sample bypass during flush cycle
9
Cooling water in
10 Heat exchanger
11 Electrical box connection
12 127 mm (5 in.) minimum
13 Customer supplied air for flow multiplier
A
Sample during normal operation
B
Sample bypass during auto flush
C
Cooling water in normal operation
22
Figure 12 SS7 sc-HST plumbing diagram
14 Sample unit
15 sc100
16 Customer supplied power on/off switch box (NEMA 4X)
17 Power in for sc controller platform
18 ¾-in. NPT adapter (supplied)
19 Drain Trap (Customer-supplied)
20 1-in. NPT adapter (supplied)
21 To drain
22 ¼-in. air purge fitting (50 SCFH instrument air max)
23 Ball valve (supplied)
24 ¾-in. NPT nipple (supplied)
25 Customer supplied hose to drain
D
E
F
required for agency compliance
Cooling water during auto flush
Electrical
Drain