Setting Battery Charge Controls; Setting Battery Jump-Start Controls - Miller TRAILBLAZER 302 AIR PAK Owner's Manual

Hide thumbs Also See for TRAILBLAZER 302 AIR PAK:
Table of Contents

Advertisement

.
A complete Parts List is available at www.MillerWelds.com

8-4. Setting Battery Charge Controls

3
2

8-5. Setting Battery Jump-Start Controls

2
OM-229 930 Page 42
1
25
1
!
Have only qualified persons
charge batteries.
1
DC/Battery/AC Switch
Place switch in Jump/Charge posi-
tion.
2
Air Compressor Switch
Place switch in position matching
voltage of battery being charged.
NOTICE − Do not change Air Com-
pressor or DC/Battery/AC switch
position while charging battery.
3
Voltage/Amperage Control
Use control to adjust charging cur-
rent between 10 and 75 amperes.
Use minimum setting for single
standard battery. Increase charge
amperage for multiple batteries or
larger size batteries.
.
Charging current automatically
stops when terminal voltage is
15 to 25 percent above re-
quired battery voltage.
Start engine and charge battery for
10 minutes. Check battery voltage.
Continue charging if necessary.
!
Stop engine when finished
charging. Stand as far from
battery as practical and dis-
connect charging cables
from welding generator. Re-
move charging cables from
battery Negative (−) cable
first.
Ref. 255 585-A
!
Have only qualified persons
jump batteries.
1
DC/Battery/AC Switch
Place switch in Jump/Charge posi-
tion.
2
Air Compressor Switch
Place switch in position matching
voltage of battery being jumped.
NOTICE − Do not change Air Com-
pressor or DC/Battery/AC switch
position while jumping battery.
Start engine. Attempt to start equip-
ment with dead battery.
!
Stop engine when finished
charging. Stand as far from
battery as practical and dis-
connect charging cables
from welding generator. Re-
move charging cables from
battery Negative (−) cable
first.
Ref. 255 585-A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trailblazer 302 air pak

Table of Contents