5.3 Installation variants

Explanation of the installation variants depending on the roof construction or design variants.
IV 1 – Base troughs on system edge
e
A
e
Edge
A
IV 2 – Installation of expansion joints
in the base troughs
IV 3 – Securing the base foot /
module supports set
IV 4 – Module supports East-West
e
M
e
Joint
M
The first base trough at the system edge /
expansion joint must be installed flush with the
modules, the subsequent base troughs must be
positioned centrally beneath the module joint.
System edge /
expansion joint:
Module joint:
Prerequisite:
Joint
Push the base trough expansion joint centrally into
the adjacent base troughs. A gap of 50 mm must
remain between the ends of the rails. Screw the
expansion joints to the base troughs. On the moving
side, the two screws must be screwed into the base
50
trough so that they are centred in the slots.
Installation expansion joint not below a
base trough length with the base trough expansion
joint approx. 34 m, plan for proper expansion joints
after this.
Depending on requirements, the base foot and
module support may need to be secured with
screws.
Regarding the occurring loads the module support
set of the East-West II system variant must be
installed with a single or a double leg.
Prior to installation, the position (installation axis) of
the components must be determined on the base
trough. Depending on the existing conditions on
site, installation using the installation and removal
tool is recommended.
10
e
= module length – 69mm
A
e
= module length + 12 mm
M
Approval from module
manufacturer for module
clamping
modul.
Max.

Advertisement

Table of Contents
loading

This manual is also suitable for:

East-west ii

Table of Contents