Module Installation, Load Redistribution And Ballast - BayWa closed II Installation Manual

Table of Contents

Advertisement

Installing module supports
Installing expansion joints

5.2 Module installation, load redistribution and ballast

Installing the module
Fastening the modules on the row end
50
Insert the component into the base trough on one
side as shown and then click into the base trough.
The component may need to be screwed down,
depending on the wind load (IV 3).
Installation module support East-West regarding
IV4.
Prior to installation, the position (installation axis) of
the components must be determined on the base
trough. Depending on the existing conditions on
site, installation using the installation and removal
tool is recommended.
Push the expansion joint profile through the
openings of the adjacent module supports and
secure using the screw provided.
Installation of expansion joints is necessary after
approx. 17 m (10 modules next to each other).
After approx. 34 m (20 modules), the system must
be properly separated.
The distance between the adjacent base troughs
must be 50 mm.
Position the module on the base feet before placing
it on the module support set. Notes regarding
module installation for East-West II see IV5.
- Wire adjacent modules when installing them
- Install the string cable first
Secure modules at the end of a row or at a break in
the row (light domes, fans, etc.) using the flat roof
end clamp (short side).
Push the clamping block of the module fastener
beneath the module, place the fastener on the
module and screw the drilling screw through the
bore hole.
Tightening torque max. 6 Nm.
The screw must not be overtightened!
Clamp on the short frame side.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

East-west ii

Table of Contents