Installation System Components - Installation Variants - BayWa novotegra closed II Mounting Instructions

For flat roofs
Hide thumbs Also See for novotegra closed II:
Table of Contents

Advertisement

* The components vary depending on the requirements of the roof, the structural analysis and the choice of
components and may deviate from the images above.
Figure
4.2 Installation system components – installation variants
Figure
** Required components for ballast distribution at system edge, depending on substructure construction.
Flat roof mounting screw chipless
Material: V2A
Tool: Socket bit AF 8 mm
Alu edge protector self-adhesive
Material: Aluminium
Equipment
Use for tool
Cordless
Bit Torx TX 40
screwdriver
Socket bit AF 8 mm
Torque key up
to at least
Socket bit AF 8 mm
12 Nm
Chopsaw
---
Place / replace
For place / replace of base foot and
tool base trough
module supports set in the base
150-30
trough 150-30
Tool
Component**
Module support set 13° East-West
Material: Aluminium
Support Brace 20x20x1.5 East-West
Material: Aluminium
Wind deflector 13° 1.85 m East-West
Material: Aluminium
Tool: Socket bit AF 8 mm
C-rail (base profile, base trough)
Material: Aluminium
Rail connector set
Material: Aluminium and V2A
Tool: Special lock nut AF 18 deep
PE pad 140 x 390 x 20 mm
Material: PE foam
5
Fastening equipment
Seal parts and
protective devices
Application
Component
connections, clamp
assembly
Clamp assembly
Cutting rails
Correct installation
Product group
Module elevation
Profile rail
Module elevation
Profile rail
Profile rail

Advertisement

Table of Contents
loading

This manual is also suitable for:

Novotegra east-west ii

Table of Contents