MEDIA INSTALLATION
(continued)
Glass media
Fill tray with volcanic rock the rock level reaches the bottom of the burner tubes.
Lay glass media on top of volcanic rock until burner tubes are covered by one layer of glass
media. Spread evenly around tray.
Do not cover pilot area.
Do not overfill with media above the pilot cover level.
Do not overload with media and smother flame.
Do not use any other media than as supplied and recommended by the manufacturer. Use of
other media may result in explosive media which may cause injury or damage.
Glazed pebbles
Fill tray with glazed pebbles until all burners tubes are covered by one layer of media. Spread
evenly around tray.
Do not cover pilot area.
Do not overfill with media above the pilot cover level.
Warning – new or wet media may cause spitting of hot material from the fire and may
present a burns risk.
Warning - New media or wet media should be fired for approx 45 minutes prior to normal
use to prevent unwanted spitting. A safe distance of 5 metres should be observed during
this period.
Do not overload with media and smother flame.
Do not use any other media than as supplied and recommended by the manufacturer. Use of
other media may result in explosive media which may cause injury or damage.
Do not cover or block pilot cap ventilation holes.
18