Set-Up
Install Upper Handle
1.
Align upper handle mounting holes with desired
mounting holes in rear frame (upper or lower set
of holes)
2.
Secure each side with (2) 3/8 –16 x 1" (26mm)
flange bolts and flange nuts (Fig. 4). Torque
bolts to 25 ft. lbs. (34 N.m).
3.
Route cables and wire harness inside of frame
(Fig. 4)
5
2
4
Figure 4
1. Upper handle
2. Rear frame
3. Flange bolt 3/8 x 16–1"
(26mm)
14
1
3
5
1719
4. Flange nut 3/8
5. Wires and cables
Connect Throttle Cable
1.
Route throttle cable under fuel tank supports and
around right side of engine (Fig. 5).
2.
Move remote throttle control lever forward until
there is approximately 1/8 in. (3.5 mm) between
lever and front end of slot in control base.
Figure 5
1. Throttle cable
2. Choke cable
3.
Hook wire Z–bend into top hole of governor arm
(Fig. 6).
4.
Loosen cable clamp screw allowing cable
installation, but do not tighten (Fig. 6).
5.
Pull throttle cable firmly until governor arm
contacts stop and tighten cable clamp screw to
lock adjustment in place (Fig. 6).
Figure 6
1. Governor arm
2. Throttle cable
2135
3. Cable clamp
2136
3. Cable clamp screw