Install Upper Handle; Connect Throttle Cable - Toro ProLine 30159 Operator's Manual

Mid-size 13 hp traction unit
Table of Contents

Advertisement

Set-UP

Install Upper Handle

1.
Align upper handle mounting holes with desired
mounting holes in rear frame (upper or lower set
of holes)
2.
Secure each side with (2) 3/8 –16 x 1" (26mm)
flange bolts and flange nuts (Fig. 4). Torque
bolts to 25 ft. lbs. (34 N.m).
3.
Route cables and wire harness inside of frame
(Fig. 4). Secure wires and cable to handle with
wire tie.
Figure 4
1. Upper handle
2. Rear frame
3. Flange bolt 3/8 x 16–1"
(26mm)
12
m–4189
4. Flange nut 3/8
5. Wires and cables

Connect Throttle Cable

1.
Place throttle control lever in FAST
position.(Fig. 5).
2.
Hook wire Z–bend into hole of speed control
lever (Fig. 5).
3.
Loosen cable clamp screw allowing cable
installation, but do not tighten (Fig. 5).
4.
Move control cable casing and wire until hole in
speed control lever is aligned with hole in base
plate. Insert a 1/4 in. (6.35 mm) diameter pin or
bolt into aligned holes to hold adjustment.
5.
Pull throttle cable slightly to remove any slack
and tighten cable clamp screw to lock
adjustment in place.
6.
Remove alignment pin and check control
operation.
Figure 5
1. Wire Z-bend
2. Speed control lever
3. Base plate
m–22596
4. Alignment holes 1/4 in.
(6.35mm)
5. Cable clamp

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents