Set-Up; Loose Parts - Toro ProLine 30180 Operator's Manual

Mid-size 16 hp traction unit
Table of Contents

Advertisement

Set-up

Loose Parts

Note:
Use the chart below to verify all parts have been shipped.
DESCRIPTION
Upper Handle
Flanged bolt 3/8–16 x 1" (26 mm)
Flange nut 3/8–16
R-clamp
Shift lever
Shift lever mounting bracket
Washer 1/4"
Bolt 1/4–28 x 2" (51 mm)
Rod fitting
Clevis pin
Washer
Hairpin cotter
Fuel tank
Control panel
Bolt 5/16–18 x 7/8" (22.5 mm)
Lock washer 5/16"
Washer 5/16"
Hose clamp
Lock nut 1/4–20
Cable tie
Wire tie
Lock nut 5/16–18
Lock nut 1/4–20
QTY.
1
4
Install upper handle to frame
4
1
Secure throttle and choke cables
1
1
Install shift lever to transmission
1
1
2
2
Install control rods
2
2
1
1
4
Install fuel tank and control panel
4
4
2
1
Install wire harness
1
1
Retain wire harness
1
Secure negative battery cable to engine bolt
1
Secure positive battery cable to solenoid
USE
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents