Install Upper Handle; Connect Throttle Cable - Toro ProLine 30165 Operator's Manual

Mid-size 12.5 hp traction unit
Hide thumbs Also See for ProLine 30165:
Table of Contents

Advertisement

Install Upper Handle

1.
Align upper handle mounting holes with desired
mounting holes in rear frame (upper or lower set
of holes)
2.
Secure each side with (2) 3/8 –16 x 1" (26mm)
flange bolts and flange nuts (Fig. 4). Torque
bolts to 25 ft. lbs. (34 N.m).
3.
Route cables and wire harness inside of frame
(Fig. 4)
Figure 4
1. Upper handle
2. Rear frame
3. Flange bolt 3/8 x 16–1"
(26mm)
1719
4. Flange nut 3/8
5. Wires and cables

Connect Throttle Cable

1.
Place throttle control lever in FAST position.(Fig. 5).
2.
Hook wire Z–bend into hole of speed control lever
(Fig. 5).
3.
Loosen cable clamp screw allowing cable
installation, but do not tighten (Fig. 5).
4.
Move control cable casing and wire until hole in
speed control lever is aligned with hole in base
plate. Insert a 1/4 in. (6.35 mm) diameter pin or
bolt into aligned holes to hold adjustment.
5.
Pull throttle cable slightly to remove any slack
and tighten cable clamp screw to lock
adjustment in place.
6.
Remove alignment pin and check control
operation. Refer to Adjusting Throttle - Choke
Control, page .
Figure 5
1. Wire Z-bend
2. Speed control lever
3. Base plate
Set-Up
2070
4. Alignment holes 1/4 in.
(6.35mm)
5. Cable clamp
11

Advertisement

Table of Contents
loading

Table of Contents