Getting Started; Overview Of Startup Procedures; Unpacking Guidelines; Table 1-1 Startup Overview - Emerson MVME55006E Installation And Use Manual

Hide thumbs Also See for MVME55006E:
Table of Contents

Advertisement

Hardware Preparation and Installation
1.4

Getting Started

This section provides an overview of the steps necessary to install and power up the
MVME5500 and a brief section on unpacking and ESD precautions.
1.5

Overview of Startup Procedures

The following table lists the things you will need to do before you can use this board and tells
where to find the information you need to perform each step. Be sure to read this entire
chapter, including all Caution and Warning notes, before you begin.

Table 1-1 Startup Overview

What you need to do...
Unpack the hardware.
Configure the hardware by setting jumpers
on the board.
Install the MVME5500 board in a chassis.
Connect any other equipment you will be
using
Verify the hardware is installed.
1.6

Unpacking Guidelines

Unpack the equipment from the shipping carton. Refer to the packing list and verify that all
items are present. Save the packing material for storing and reshipping of equipment.
20
Refer to...
Unpacking Guidelines on page 20
Configuring the Board on page 22
Procedure on page 41
Connection to Peripherals on page 42
Completing the Installation on page 43
MVME55006E Single Board Computer Installation and Use (6806800A37H)

Advertisement

Table of Contents
loading

Table of Contents