Gree GMV-PD100W/NAB-K Service Manual page 123

Dc inverter multi vrf
Table of Contents

Advertisement

5. Fix the new
compressor to chassis
6. Connect the suction and
exhaust pipe of compressor
to system pipeline
7. Connect the power cables
of compressor correctly
8. Check and open
the cover plate
Use spanner to remove the
Replace and lock
the compressor.
Then, connect
the pipe properly.
Mark the power
cable colors and
corresponding
terminal codes
during removal.
DC Inverter Multi
VRF Service Manual
onto the base seat.
of compressor and connect
it to the compressor
Note: During welding, take care not
Note: When connecting the power
cable, please take care on the
marking of power cable color and
corresponding terminal code.
connected properly;
connected properly;
and back cover plate.
119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents