Checking And Adjusting The Auger/Impeller Cable; Checking The Auger Gearbox Oil Level - Toro Power Max 726 OE Operator's Manual

Hide thumbs Also See for Power Max 726 OE:
Table of Contents

Advertisement

Figure 37
3. Loosen or tighten the turnbuckle to adjust the spring
length to 5.5 cm (2.18 inches).
Figure 38
1. Jam nut
2. Turnbuckle
4. Tighten the jam nut
tension on the cable.
5. If the traction cable is properly adjusted but a problem
remains, contact an Authorized Service Dealer.
Checking and Adjusting the
Auger/Impeller Cable
Service Interval: After the first 2 hours—Inspect the
auger/impeller cable and adjust it if
necessary.
Yearly—Inspect the auger/impeller cable and adjust
or replace it if necessary.
1. Loosen the jam nut.
2. Engage the auger/impeller lever and hold it in place
(Figure
39).
3. Spring
4. 2.18 inches (5.5 cm)
(Figure
38), ensuring there is slight
3. Loosen or tighten the turnbuckle to adjust the spring
length to 7 cm ( 2.75 inches)
1. Jam nut
2. Turnbuckle
4. Tighten the jam nut
tension on the cable.
5. If the auger/impeller cable is properly adjusted but
a problem remains, contact an Authorized Service
Dealer.
Checking the Auger Gearbox
Oil Level
Service Interval: Yearly—Check the auger gearbox oil and
add oil if necessary.
1. Move the machine to a level surface.
2. Clean the area around the pipe plug
21
Figure 39
(Figure
40).
Figure 40
3. Spring
4. 7 cm ( 2.75 inches)
(Figure
40), ensuring there is slight
(Figure
41).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

38813

Table of Contents