Drag Link Installation - TOHATSU M 60C Owner's Manual

Hide thumbs Also See for M 60C:
Table of Contents

Advertisement

the shift cable. Check that the shift
lever is in "NEUTRAL" position and that
the free throttle lever is fully closed
when the remote control cables have
been connected.
4
1. Free throttle lever
2. Fully opend
3. Fully closed
°
4. Approx. 32
* The advancer arm on the engine should
be contact with the stopper of the car-
buretor throttle valve to enable it to be
fully closed.
1. Advancer arm
2. Carburetor throttle valve (fully closed side)
2
1
3
ENOF02312-0
2
1
ENOF02324-0
6. Connect cord assembly B to cord
assembly A, and connect the meter
cord assembly.
7. Connect the pink and light-blue leads
from cord assembly A and B to each
other.
8. Using the washers and R-pins to
adjust the thread length, connect the
throttle and shift cables to the pins on
the engine-side.
9. Insert the outer groove of each cable
into the cable grip provided in the
lower engine cover. (115, 140)
Attach the cord clamps and fix the
cables securely with the bolts.
ENOM01707-0

3. Drag link installation

(Standard accessories for EPTO types)
Incorrect or unstable installation of the
Drag Link assembly can result in accidents
while riding the boat or breakage of the
hull.
Installation of the Drag Link Assembly by
your dealer is highly recommended.
ENON00932-0
Note
Depending on the steering cable manufac-
ture, spacers (optional) may be required.
1. Connect the Drag Link rod to the tip of
the steering cable. Tighten the rod
using the nylon nut, making sure the
rod can swing freely.
2. Connect the other tip of the rod to the
steering bracket with a bolt, first apply-
ing a collar and washer. The bolt head
must face downward.
29
INSTALLATION
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

M 70cxM 140a2M 70cM 90a2M 115a2

Table of Contents