Initial Engagement And Clutch Lock-Up Inspection; Initial Engagement Inspection - Suzuki LT-A50 Service Manual

Table of Contents

Advertisement

2-16 PERIODIC MAINTENANCE
INITIAL ENGAGEMENT AND CLUTCH
LOCK-UP INSPECTION
The LT-A50 is equipped with a centrifugal type automatic clutch.
To insure proper performance and longevity of the clutch assem-
blies it is essential that the clutches engage smoothly and gradu-
ally. Before checking the initial engagement and clutch lock-up
two inspection checks must be performed to thoroughly check the
operation of the drive train. Perform the following:
• Check the oil level. ("2-8)
• Warm up the engine.

INITIAL ENGAGEMENT INSPECTION

• Connect the tachometer onto the spark plug lead.
• Start the engine.
• Slowly open the throttle and note the engine speed (r/min) when
the vehicle begins to move forward.
$ Engagement speed: 2 200 – 2 600 r/min
If the engagement speed does not coincide with the standard
range, inspect the following items for any abnormalities.
* Clutsh shoes ................................... "3-17
* Clutch wheel ................................... "3-17

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents