Page 1
Installation, Operation and Maintenance Instructions RESERVE POWER...
Page 2
The ambient temperature will affect the self discharge and therefore the time between recharges. Batteries should not be kept in a discharged condition. Months on Shelf State of charge (20°C) 100% State of charge (30°C) 100% www.enersys-emea.com...
A site acceptance test, consisting of a fully loaded discharge for the 2.1 CONSTANT VOLTAGE FAST CHARGING required autonomy time, should be performed approximately 7 days after installation and commissioning. EnerSys can give recommendations for In order to facilitate more rapid charging of the DataSafe MX battery, it is each application.
All monoblocs for disposal should be shipped to a recognised scrap the monobloc as recoverer, or regulated collection point. necessary EnerSys utilises a licensed reprocessor of lead and plastics. We will, at no 4 Cleanliness Check for If contaminated charge, dispose of batteries if they are delivered to our factory in Newport,...
Page 5
Site: Installation date: Inspection date: Monobloc type: Float Voltage: No series: Temperature: No parallel: Battery Number: Bank Number: V/Mb V/Mb V/Mb V/Mb V/Mb V/Mb V/Mb V/Mb Mechanical condition: Key: Other observations: Mb = Monobloc Signature: No. = Number Organisation: www.enersys-emea.com...
Need help?
Do you have a question about the Data Safe MX and is the answer not in the manual?
Questions and answers