Summary of Contents for EnerSys FRONT TERMINAL Series
Page 1
F R O N T T E R M I N A L S E R I E S 2 V D I N - S I Z E S E R I E S Installation, Operation and Maintenance Manual Visit us at www.enersys.com...
Page 2
The maximum storage times before a refresh charge is required and recommended open circuit voltage audit intervals are: Upon the receipt of the shipment, check the contents for damage and against the packing slip. Immediately inform EnerSys of any damaged Temperature (°C / °F) Storage Time (Months) OCV Audit Intervals (Months) or missing items.
Page 3
® related to the duty as follows: batteries can be mounted in any orientation except inverted. However, in cyclic applications, EnerSys recommend to install 2 volt DIN-size cells in horizontal orientation. In such configuration the instructions below must be Duty Minimum end voltage complied with.
Need help?
Do you have a question about the FRONT TERMINAL Series and is the answer not in the manual?
Questions and answers