Fujitsu AW*Z24LBC Service Instruction page 88

Ceiling wall inverter
Hide thumbs Also See for AW*Z24LBC:
Table of Contents

Advertisement

PROCESS
Connect WIRE WITH TERMINAL
(THERMISTOR)
REGULATIONS
As shown Fig.3, connect wires.
A right picture shows the example of two times of the twist.
The point must become complete in each wire
that does the twist.
RE P LA CEM EN T PA R T S
09-25
W25 ORANGE W26 ORANGE
(FILTER PWB)
WIRE WITH TERMINAL
W25 and W26 must do the twist
13 times from 10 times
W28 and W29 must do the twist
13 times from 10 times
W28 ORANGE (FILTER PWB)
WIRE WITH TERMINAL
W29 BROWN(FILTER PWB)
WIRE WITH TERMINAL
Fig.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ao*z24lbt

Table of Contents