PROCESS
Install PWB ASSY
REGULATIONS
A euphotic part board and a connector are pulled out from a hole.
When caught, don't pull out forcibly.
Like a fig.2~4 CONNECTOR PWB through the hole A, and slide PWB ASSY,
and set PWB ASSY by the ditches.
Pay attention PWB ASSY must be in the ditch C. The run ashore is NG
When insert PWB ASSY to CONTROL COVER , take care not to damage its back.
Moreover, the thing which it is careful of not to catch the test connector of CN3
Ditch C
fig.1
Ditch B
fig.3
RE P LA CEM EN T PA R T S
Hole A
Ditch A
CONTROL COVER
09-06
fig.2
fig.4
Ditch D
CN3
Warn against
catching UV harness
in the case of
substrate
insertion.