Fujitsu AW*Z24LBC Service Instruction page 76

Ceiling wall inverter
Hide thumbs Also See for AW*Z24LBC:
Table of Contents

Advertisement

RE P LA CEM EN T PA R T S
Wiring of a piping thermistor lead
E
Don't slack each lead in the heat exchanger cover upper part.
F
Spring
E
Do not touch each lead and the spring.
Remainder of each lead (UV unit, room temperature,
piping thermistor lead) is put in between a heat
exchanger cover and an electrical control unit,
as shown in the above figure.
G - G
F
Transparent tube
Piping thermistor
G
G
Piping thermistor
09-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ao*z24lbt

Table of Contents