T O C O N N E C T - Elite SL-3000-UL SERIES Instruction Manual

Table of Contents

Advertisement

H O W
White Wires
Black Wires
(Neutral)
(120 VAC)
Green Wires (Ground)
WIRE GUAGE REQUIREMENT FOR 120 VAC POWER SUPPLY: 1/2 HP AND DUAL MOTOR ONLY
16 Gauge
14 Gauge
150 Feet
250 Feet
Caution: ELITE ACCESS SYSTEMS, INC. is not responsible for conflicts between the information listed in the above chart and the requirements
of your local building codes. The information is for suggested use only. Check your local codes before installation.
Gate Operator MUST be properly grounded.
A D J U S T I N G
Plate
Before Adjusting, Do the Following:
1.Turn the Power OFF!
2. Push the plate inward. Roll the
nut to the direction desired.
T O
C O N N E C T
Do Not Use This Outlet Unless You Are
An Authorized Service Technician
Suggestion:
Seal all open holes of
electronic box with
sealant when finished
wiring.
Use U.L. Listed Conduit
for Supplying Power to
the Unit
12 Gauge
10 Gauge
400 Feet
G A T E
T R A V E L I N G
Push Plate
P O W E R
8 Gauge
650 Feet
1000 Feet
Each notch indicates an
estimated 1 inch of gate travel
3. Place the plate back in the notch.
4. Turn the machine off.
5. If you need more adjusting,
repeat the process.
Minimum:
15-Amp
Breaker Switch
Per Operator
Required
4 Gauge
2200 Feet
D I S T A N C E
Nut

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-3000-ul-dmSl-3000-ulSl-3000-ul-1hp

Table of Contents