22 / Installation
RPI Requirements
Base Stations
1–8
9–16
17–24
25–32
Mounting the RPI unit
1. Position the screw holes for the RPI using the dimensions
shown in the following figure.
RPI mounting holes
25 mm
(1 in.)
To provide adequate ventilation and to prevent
overheating, leave a clearance of at least 125 mm (5 in.)
around the RPI.
If you are mounting two RPIs, one above the other, leave
a clearance of at least 300 mm (12 in.) between them to
provide adequate ventilation and to prevent overheating.
MICS-XC Norstar-Companion Installer Guide
RPI-16 and RPI-8 required
1 RPI-8
1 RPI-16
1 RPI-16 and 1 RPI-8
2 RPI-16
325 mm
(13 in.)
Keyholes
PSUs required
1 PSU
2 PSUs
3 PSUs
4 PSUs
50 mm
(2 in.)
300 mm
(12 in.)
P0881594 Issue 01