Before You Begin - Nortel Ethernet Routing Switch 8010 Installation Manual

Nortel networks switch installation guide
Hide thumbs Also See for Nortel Ethernet Routing Switch 8010:
Table of Contents

Advertisement

Before You Begin

The physical requirements for installing the Passport 8010 Chassis in an equipment rack are:
Adequate room (13.1 spaces) is provided in an EIA or IEC standard 19-inch (48.2-centimeter)
equipment rack that is:
— Bolted to the floor
— Braced if necessary
— Grounded
Side rail dimensions are similar to this illustration. Typical
racks with these dimensions are the Chatsworth Products,
Inc. (CPI) rack and the B-Line rack.
At least 6 inches (15.2 cm) exists between adjacent equipment racks to allow airflow and
cooling.
Adequate front and side clearance exists for cables. One module may have up to 48 ports. Allow
enough space at the left of the chassis for cables and cable management hardware.
For table or shelf installation, make sure the surface will support at least 225 pounds (101 kilograms).
Make sure the area where you will install and use the Passport 8010 Chassis meets these
environmental requirements:
Ambient temperature between 5 ° and 40 ° C (41 ° and 104 ° F)
Relative humidity between 5% and 85% noncondensing
No nearby heat sources such as hot air vents or direct sunlight
No nearby sources of severe electromagnetic noise
No excessive dust
Adequate power source within six feet; one 15-Amp circuit required for each power supply
2
3 in =
7.6 cm
9114FA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 8010

Table of Contents