Aiwa xd-pg700 Service Manual page 77

Hide thumbs Also See for xd-pg700:
Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY -3/3
QQ
3 7 63 1515 0
GUIDE UP/DOWN
TE
L 13942296513
5. Frame Assembly Up/Down
Note
Put the Base Main face down(Bottom Side)
1) Release the Screw(S4)
2) Unlock the Locking Tab(L3) in direction of arrow and
then lift up the Frame Assembly Up/Down to separate
it from the Base Main.
Note
• When reassembling move the Guide Up/Down in direction
of arrow(C) until it is positioned as Fig.(C).
• When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of the Guide
Up/Down as Fig.(B)
6. Belt Loading(Fig. 4-4)
Note
Put the Base Assembly Main on original position(Top Side)
7. Gear pulley (Fig. 4-4)
1) Unlock the Locking Tab(L4) in direction of arrow(B) and
then separate the Gear Pulley from the Base Main.
www
.
http://www.xiaoyu163.com
GEAR LOADING
GEAR PULLEY
(L4)
BELT LOADING
PWB ASSEMBLY LOADING
(L6)
(S5)
BASE MAIN
(A)
(L5)
FIG. (A)
(C)
(B)
FIG. (C)
x
ao
y
i
http://www.xiaoyu163.com
8
GUIDE UP/DOWN
(L3)
(L6)
BASE MAIN
(H1)
(C2)
(S4)
(A)
(B)
(A)
(B)
FIG. (B)
GUIDE UP/DOWN
Q Q
3
6 7
1 3
GUIDE UP/DOWN
Fig. 4-4
8. Gear Loading (Fig. 4-4)
9. Guide Up/Down (Fig. 4-4)
1) Move the Guide Up/Down in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
Note
When reassembling place the Guide Up/Down as Fig.(C)
and move it in direction arrow(B) until it is locked by the
Locking Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10. PWB Assembly Loading
Note
Put the Base Main face down(Bottom Side)
1) Release 2 Screws(S5)
2) Unkool the Loading Motor Connector (C2) from the
Hook (H1) on the Base Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB
Assembly Loading from the Base Main.
11. Base Main(Fig. 4-4)
u163
.
-77-
2 9
9 4
2 8
(L6)
FRAME ASSEMBLY UP/DOWN
1 5
0 5
8
2 9
9 4
m
co
9 9
2 8
9 9

Advertisement

Table of Contents
loading

Table of Contents