Maintenance; Scheduled Maintenance Table - Nilfisk-ALTO scrubtec 343.2 User Manual

Hide thumbs Also See for scrubtec 343.2:
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH

MAINTENANCE

The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
The following chart provides the scheduled maintenance. The intervals shown may vary according to particular working conditions,
which are to be defined by the person in charge of the maintenance.
WARNING!
Maintenance procedures must be performed with the machine switched off and the power supply cable plug
disconnected from the electrical mains.
Moreover, carefully read the instructions in the Safety chapter.
All scheduled or extraordinary maintenance procedures must be performed by qualified personnel, or by an authorised Service
Center.
This Manual describes only the easier and most common maintenance procedures.
NOTE
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service Manual that can be
consulted at any Service Center.

SCHEDULED MAINTENANCE TABLE

Procedure
Squeegee cleaning
Brush cleaning
Tank and vacuum grid cleaning
Power supply cable check
Squeegee blade check and replacement
Solution filter cleaning
Screw and nut tightening check
Vacuum system motor carbon brush check and replacement
(1) And after the first 8 working hours.
(2) This maintenance procedure must be performed by Nilfisk Alto authorised Service Center.
16
USER MANUAL
SCRUBTEC 343.2 - 9099644000
Daily, after us-
Weekly
ing the machine
Every six
Yearly
months
(1)
(2)

Advertisement

Table of Contents
loading

Table of Contents