Part 8 Trial Operation And Field Settings - Daikin FTXG25JV1BW Service Manual

Inverter pair wall mounted type j-series
Hide thumbs Also See for FTXG25JV1BW:
Table of Contents

Advertisement

1. Pump Down Operation........................................................................218
2. Forced Cooling Operation ...................................................................219
3. Trial Operation ....................................................................................221
4. Field Settings ......................................................................................222
217
Trial Operation and
4.1 When 2 Units are Installed in 1 Room..................................................222
4.2 Standby Electricity Saving....................................................................223
4.3 Jumper and Switch Settings.................................................................223
and a Diode Bridge .............................................................................224
Field Settings
Trial Operation and Field Settings
SiBE041012_A
Part 8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents