Flue Terminal Positions - Worcester Greenstar Heatslave II ErP 12/18 Installation, Commissioning And Servicing Instruction Manual

Floor standing oil-fired condensing combination boiler using conventional and room sealed flue
Table of Contents

Advertisement

0 m m
1 2 0
m m
6 0 0
5 m m
*
5 3 0
m m
Fig. 21 Maintenance and repair clearances
3
Minimum air vent area (cm
) for appliances installed in
compartments
Internal ventilation
Model
High level
Low level
12/18
198
18/25
275
25/32
330
Table 4 Conventional flue
Internal ventilation
Model
High level
Low level
12/18
198
18/25
275
25/32
330
Table 5 Room sealed flue
Compartments
Follow the requirements of BS 5410 and note:
• Minimum clearances must be maintained.
• An access door is required to install, service and maintain the boiler
and any ancillary equipment.
• If fitting the boiler into an airing cupboard use a non-combustible
material (if perforated, maximum hole sizes of 13mm) to separate the
boiler from the airing space.
Venting compartments
There must be sufficient clearance around the appliance to allow proper
circulation of ventilation air. The clearances required for installation and
servicing will normally be adequate for ventilation.
• Ventilation must be provided for boilers fitted into compartments as
described in BS 5410.
• Combustion air must not be taken from a room or internal space
containing a bath or shower and must not communicate with a
protected area such as a hall, stairway, landing, corridor, lobby, shaft
etc.
• Air vents must allow access for clean free air and must be sited to
comply with the flue terminal position requirements.
• Air duct runs must not exceed 3 m.
• Low level air vents must be less than 450mm from the floor.
• A warning label must be added to the vents with a statement to the
effect: "Do not block this vent. Do not use for storage".
Greenstar Heatslave II
ErP -
6 720 813 344 (2014/09)
3 0 0
m m
5 m m
*
External ventilation
High level
Low level
297
99
198
413
138
275
495
165
330
External ventilation
High level
Low level
198
99
99
275
138
138
330
165
165
Showers/bathrooms
WARNING: Conventional flues
▶ Conventional flued boilers must not be installed in a
bathroom, bedroom, or bedsitting room.
WARNING: Electrical
▶ Any appliance using mains electricity must not be
able to be touched by a person using the bath or
shower.
▶ Electrical switches, fused spur and socket outlets
must not be fitted in a bathroom.
▶ In all cases the IET wiring regulations must be
consulted.
▶ All pipework in bathrooms must be cross bonded
The boiler must not be installed in the bath or shower or in zones 1 or 2
(the shaded areas shown in figure 22).
The boiler can be installed outside the shaded areas.
2* Without the end wall, zone 2 must extend 600 mm from the bath
Radius 600mm
Fig. 22 Bathroom zones
4.8

Flue terminal positions

Flue terminals must be positioned to avoid combustion products
entering into buildings.
The flue must be fitted and terminated in accordance with the
recommendations of BS 5410.
The flue must not cause an obstruction.
Discharge from the flue outlet must not cause a nuisance.
Flue gases have a tendency to plume and in certain weather conditions a
white plume of condensation will be discharged from the flue outlet
which could be regarded as a nuisance, for example, near security
lighting.
There should be no restriction preventing the clearance of combustion
products from the terminal.
The air inlet/outlet duct and the terminal of the boiler must not be closer
than 25 mm to any combustible material. Detailed recommendations on
protection of combustible materials are given in BS 5410:1
A protective stainless steel terminal guard, must be fitted if the terminal
is 2 m or less above a surface where people have access.
See "Contact Information" on the back cover for flue guard information.
The following additional guidelines (from part L Exceptions Guidance
Document) are recommended when determining the flue outlet
position:
Avoid discharging flue gases into car ports or narrow passageways.
Pre-Installation
6720646608-124.3Wo
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents