Furuno FSV-24 Installation Manual page 46

Hide thumbs Also See for FSV-24:
Table of Contents

Advertisement

Note: LED Checking
LED (inverse phase detector) shown in the above figure lights when the
power cable is incorrectly connected. If the LED lights, reconnect the
power cable after turning off the main switch. (See page 3-1.)
2-20
100
25
20
Vinyl
Sheath
Armor
sheath
(Clamp here by cable clamp.)
Power cable fabrication
M4(yellow) x 3
FV5.5-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-24s

Table of Contents