Zero Clearance Model Timber Frame Installation Procedure - RealFlame PYROTECH Installation & Operating Manual

Table of Contents

Advertisement

PYROTECH ZERO CLEARANCE MODEL
Pyrotech Zero Clearance Timber Frame Installation
(Recommended only)
A
From hearth
B
NOTE: Note: If fire is to be installed off the floor with 4
sided trim, use same A, B, C and D dimensions as shown
with frame work included below fire to required height.
D
Approx 20mm for
hearth if required.
NOTE
Plasterboard to run beyond stud as shown,
and to go behind fixing flange on unit.
IMPORTANT
Install unit and
fluing before
plasterboard.
Plaster to run
beyond stud and
behind trim
C
Min 50mm
clearance
D
(Recommended only)
A
HEATER
TRIM
B
CLEARANCES FROM
COMBUSTIBLES
Floor
Sides
Top
Flue Outer
C
0 mm
50 mm
100 mm
50 mm