PYROTECH ZERO CLEARANCE MODEL
Pyrotech Zero Clearance Installation Procedure
TICK BOXES
Connect to gas supply.
Connect to power supply
Install flue to 500mm minimum above roof line. (Min total flue run 3.6 m)
Plaster to unit with trim removed.
Install trim.
Assemble unit as per page 10-11.
Test the unit for safe operation and show customer correct operating procedures.
12
400mm
675mm
610mm
112mm
52mm
Power Outlet
865mm
Trim
280mm
120mm
35mm
635mm
Gas Inlet