AeroWorks ULTIMATE 20-300 ARF-QB Assembly Manual page 52

Table of Contents

Advertisement

9. Install the teflon coupler and clamp onto the
tuned pipe at this time. Slide the pipe into the
tunnel and through the mounting bracket as
shown. Repeat step for remaining pipe.
10. Finished tuned pipe installation shown below.
11. Install headers using the supplied gasket or high
temp silicon gasket material and securely bolt to
cylinder heads as shown.
Note: Use a drop of blue Loctite on header mounting
bolts before installation.
12. Reinstall the tunnel hatch covers as shown be-
low.
13. It may be necessary to install teflon extensions
to the pipe stingers. The extensions should exit
the fuse by at least 1" to ensure the exhaust gas-
ses will clear the pipe tunnel.
52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents