8.11 Inspection And Maintenance Reports - Buderus Logano GB125/22 BE Installation And Service Instructions Manual

Low emissions and high efficiency condensing oil boiler
Table of Contents

Advertisement

8.11 Inspection and maintenance reports

V Initial and date the servicing operations completed.
Service work
1.
Check general condition of the heating system
2.
Visual inspection and function check of the heat-
ing system
3.
Checking fuel and water-carrying components of
the system for:
– Leaks during operation
– Leak test
– Visible signs of corrosion
– Signs of ageing
4.
Check the combustion chamber and the heating
surface for contamination; shut down the system
for this step
5.
Check condensation heat exchanger for:
– Dirt contamination
– Damaged or hardened gaskets
6.
Check burner (
burner documentation)
7.
Check combustion air supply and flue pipe for
– Function and safety
– Leaks
– Blockages in the air supply system
– In the case of a concentric combustion air sup-
ply and flue gas pipe, blockage of the conden-
sate outlet
– Clean the condensate drain pipe and trap
8.
Check the operating pressure, relief valve and
expansion tank inlet pressure
9.
Check function of DHW cylinder and sacrificial
anode (
DHW cylinder documentation)
10.
Check programming unit settings (
ming unit documentation)
11.
Record the final checks of the inspection work,
incl. measurements and test results
Confirmation of properly completed servicing
Tab. 15 Servicing log
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
The inspection and servicing logs can also be used as
copy masters.
Page
Date:______
38
42
45
program-
Company
stamp/signature
Heating system servicing
Date:______
Date:______
Company
Company
stamp/signature
stamp/signature
8
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano gb125/35 beLogano gb125/30 be

Table of Contents