8
Reports
8.2

Inspection and maintenance reports

The inspection and maintenance reports provide an
overview of all the tasks and operations carried out.
See also Section 3: "Inspection" on page 40 or
Section 4: "Maintenance" on page 41.
Inspection tasks
1. Check general state of system
2. Visual inspection and function check of system
3. Check gas- and water-bearing components for:
- leaks;
- signs of corrosion;
- signs of ageing.
4. Take system out of service and check the burner, heat exchanger
and syphon for signs of dirt and soiling.
(see subsection 4.1.1 on page 41)
5. Check the burner, glow ignitor and ionisation electrode,
after disconnecting the system.
(see subsection 4.1.1 on page 41)
6. Measuring the ionisation current
(see subsection 2.2.10 on page 38)
7. Measure the gas connection pressure (working pressure)
(see subsection 2.2.5 on page 34)
8. Check the gas-air ratio
(see subsection 2.2.8 on page 37)
9. Gas leak test in operational condition
(see subsection 2.2.1 on page 31)
10. Measure the carbon monoxide content (CO), vacuum
(see subsection 2.2.9 on page 37)
11. Pressure-testing of heating system:
- admission pressure of expansion tank
(see installation instructions supplied with expansion tank)
- Filling pressure
12. Check ventilation and flue gas conduits for correct functioning and
safety
13. Check requirement-related adjustment settings of control device
(see documentation supplied with control device)
14. Final check of inspection tasks,
with record kept of measurement readings and test results
15. Confirm inspection carried out by qualified service engineer
and fill out the Benchmark
Company stamp / Date / Signature)
Buderus • http://www.buderus-domestic.co.uk
68
Installation and servicing instructions for wall-mounted condensing gas boiler Buderus 600 - 11R/19R/24R • 02/2006
Please check off the inspection and/or requirement-
related maintenance tasks carried out and enter the
corresponding readings.
Sign details of inspection and maintenance tasks,
indicating date carried out.
Use only original replacement parts.
Date: _____________
_________________ µA
________________ mbar
_________________ Pa
________________ ppm
________________ mbar
________________ mbar
Subject to modifications resulting from technical improvements!
Date: _____________
_________________ µA
________________ mbar
_________________ Pa
________________ ppm
________________ mbar
________________ mbar

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600 - 19r600 - 24r

Table of Contents