Installation of Industrial Bluebird Casings
FRONT
CASING
CONTROL
THERMOSTAT
BOILER
DOOR
Remove the boiler door (8 bolts) and place the 2 side panels onto the boiler plinth
locating the studs on the bottom edge of the casing into the corresponding holes on
the plinth. Then clip the rear, front and top casing onto the sides. Finally bolt the door
to the boiler ensuring that all firebricks are in position.
9.3
Industrial Boiler Firebrick Installation
TOP
CASING
LEFT HAND
SIDE CASING
Page 28
CASING
As an additional measure to ensure
the longevity of the boiler, the 300,
400 and 500 Bluebirds are supplied
with thin flat bricks fitted in the base
of the boiler. A pack of larger bricks
is supplied separately. The larger
bricks are placed on their sides at
the rear of the boiler. Each row
should be interleaved. No cement
or adhesive is required to fix the
bricks in position.
REAR
RIGHT HAND
SIDE CASING