Tayana -48 Owner's Manual page 110

Table of Contents

Advertisement

Maxwell Winches Installation Inspection Form
C)
Control Equipment
1)
Voltage / Frequency
2)
AC controller
3)
Power down control
4)
Solenoid control box
5)
Controls installed in dry location
6)
Wired correctly
7)
Breaker isolator
8)
Isolator correctly located
9)
Control circuit fuse fitted
10)
Control fuse accessible and dry
11)
Motor cables correctly sized
12)
Control cables correctly sized
13)
Battery voltage at supply
14)
Voltage at winch motorwhile running
15)
Hydraulic pressure
16)
Hydraulic flow
17)
Hydraulic hose size
18)
Comments and Recommendations
D)
General
1)
Mounting bolts greased and tightened
2)
Electrical terminals all tight
3)
Electrical terminals protectively coated
4)
Cover / protection of windlass
5)
Windlass operating correctly
6)
Chrome plating to standard
7)
Clutch handle
8)
Owners manual on vessel
9)
Cover/protection for winch shipping
10)
Comments and Recommendations
KEVIN LIU
Singned by :
Mercury Marine Supply Co., Ltd
Port Windlass
STBD Windlass
V
V
V
135AMP
V
V
V
V
V
13.69V
11.82V
V
V
V
V
V
V
V
V
V
Singned by :
Page 2/2
Port Capstan
STBD Capstan
Builder

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Tayana TAYANA-48

Table of Contents