Tayana -48 Owner's Manual page 111

Table of Contents

Advertisement

CUSTOMER:
BOAT SIZE:
ENGINE SERIAL NO.: E20218
ENGINE MODEL:
TEST DATE:
RUN TEST TIME:
SERVICE ENGINEER: LIKY CHANG
A. PREPARATION:
1: LUB OIL IN OIL SUMP:
2: FRESH WATER IN HEAT EXCHANGE:
3: INSTALLATION OF FLEXIBLE MOUNTS: WELL
4: INSTALLATION OF SUB. TANK:
5: CONTROL CABLE:
6: MIXING ELBOW POSITION:
B: START UP:
1: IDEL SPEED:
2: MAX. NO-LOAD SPEED:
3: COOLING WATER TEMP.:
4: LUB OIL PRESSUE:
5: TRANSMISSION FUNCTION:
C: REMARK:
1: DURING OPERATION CHECK ENGING NOISE, EXHAUST, TEMP.,
AND VIBRATION ETC, ALL IN GOOD CONDITION.
2: RUN TEST THE ENGING AT TA YANG'S FACTORY, NOT SEA TRIAL.
3: EQUIPMENT IS INSTALLED CORRECTLY, SO WARRANTY APPLIES.
華立企業股份有限公司
WAH LEE INDUSTRIAL CORPORATION
高雄市中正四路二三五號十樓
10F.#235.CHUNG CHENG 4 TH ROAD.
KAOHSIUNG. TAIWAN. R.O.C.
YANMAR ENGINE RUN TEST REPORT
TA-YANG YACHT BUILDING CO., LTD. (大洋)
D48-101
4LH4-HTE X
6.JUN.07
30 MINETES
KM4A2 (ratio: 2.63/1) 00346
SUFFICIENT
SUFFICIENT
INSTALLED
LAY UP IN GOOD WAY
BELOW THE WATER LINE EQUIPPED
THE VACUUM VALVE WHICH INSTALLED
THE ELBOW OF THE COOLING WATER LINE
800
RPM
3800 RPM
75 ℃
0.2 MPa
WELL