Mercury 40 4-Stroke Manual page 84

Hide thumbs Also See for 40 4-Stroke:
Table of Contents

Advertisement

Dual Outboards
Connect a common ground cable (wire size same as engine battery cables) between negative (–)
terminals on starting batteries.
b
a -
Red sleeve - Positive (+)
b -
Black sleeve - Negative (–)
SHIFT CABLE INSTALLATION
Install the cables into the remote control following the instructions provided with the remote control.
1.
Locate the center point of the slack or lost motion that exists in the shift cable as follows:
a. Move the remote control handle from neutral into forward and advance the handle to full
speed position. Slowly return the handle back to the neutral. Place a mark ("a") on the cable
next to the cable end guide.
b. Move the remote control handle from neutral into reverse and advance the handle to full
speed position. Slowly return the handle back to the neutral. Place a mark ("b") on the cable
next to the cable end guide.
OUTBOARD INSTALLATION
a
c
(-)
a
b
(-)
c -
Ground cable
d -
Cranking battery
78
d
d
15497

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents