Download Print this page

Lavit LCB 100 Technical Manual page 15

Advertisement

 
 
side   d oor   p roperly   c loses.  
 
14. Turn   o n   t he   w ater   s upply.   T urn   t he   p ower   s witch   t o   O N   a t   t he   r ear   o f   t he   d ispenser.  
 
     
 
 
The   d ispenser   i s   n ow   " live"   a nd   p roper   s afety   p recautions   s hould   b e  
followed   i f   a ny   p anels   a re   r emoved   f rom   t he   u nit.  
     
 
 
 
 
 
15. The   d ispenser   w ill   s elf-­‐check   o n   e very   p ower   u p   a nd   i f   O K   w ill   g o   t o   t he   L CD   h ome   s creen  
and   t he   L avit   B utton   h alo   w ill   b e   r ed.  
 
16. TO   F ILL   T HE   D ISPENSER   W ITH   W ATER,   P USH   T HE   L AVIT   B UTTON   A ND   T HE  
DISPENSER   W ILL   S TART   T O   F ILL.   T he   s creen   w ill   d isplay   a   W ATER   T ANK   F ILLING  
SCREEN.    
 
17. When   t he   w ater   t anks   a re   h alf   f illed,   t he   c ompressor   w ill   t urn   o n   a nd   s tart   t o   c hill.   T he   s oda  
pump   w ill   a lso   t urn   o n   w hen   t he   w ater   t ank   i s   h alf   f ull.   T he   H OME   s creen   w ill   a ppear.  
 
18. When   t he   H OME   s creen   a ppears   t urn   t he   C O
3.5   B AR   O F   P RESSURE   B Y   R OTATING   T HE   K NOB   C LOCKWISE.   3 .5   B AR   O F   P RESSURE  
(50   P SI)   I S   I NDICATED   A T   T HE   B EGINNING   O F   T HE   R ED   S CALE   O N   T HE   R EGULATOR.  
The   s oda   t ank   w ill   f ill   w ith   C O
 
 
19. Purge   a ny   a ir   f rom   t he   s ystem   b y   t oggling   t he   C O
unit.   P urge   g as   a bout   3   t imes   f or   2   s econds   e ach   t ime.  
 
Lavit   D ocument:   T M170915-­‐A    
  g as   p ressure   o n.   S ET   T HE   R EGULATOR   T O  
2
  g as.  
2
 
  P urge   V alve   l ocated   i n   t he   r ear   o f   t he  
2
 
15  
 

Advertisement

loading

Related Products for Lavit LCB 100